In spring 2026, we will build our first permanent pilot plant in Mataró on the Costa Brava.
A shaded walkway with seating in partial shade will be created on an area of around 90 m². The plant will thus create direct and tangible added value for visitors to the harbour.
The facility will be used to irrigate the port infrastructure and will also serve as a central test object under real conditions.
This pilot facility forms the technical, operational and conceptual basis for all subsequent projects and represents a decisive milestone in further development.
Objectives:
- Initial irrigation of plants
- This facility will help to get to grips with the technical details.
- Increased efficiency of freshwater production
- Cooperation with the local population