Pilot plant 2025

This page is a preview. You see AI-generated images.

In 2025, we will set up our first permanent pilot plant on the coast of the Mediterranean.

This pilot plant will lay the foundation for subsequent projects.

 

Goals:

  • First irrigation of fields
  • This system helps to get to grips with the technical details.
  • Increasing the efficiency of freshwater production
  • Cooperation with the local population

Secondary goals

These goals are definitely planned. However, they will not be tackled until the test plant is up and running and producing fresh water.

  • Conversion of fresh water into drinking water
  • Testing of purely solar thermal desalination processes (without PV cells)

 

Detailed project parameters and application form for the 2025 pilot plant site

Pflanzenaufzucht in der Wüste mit Photovoltaikmodulen als Schattenspender